PV modules
Monocrystalline and polycrystalline panels, including half-cut, bifacial and large-format cell designs, specified on output, efficiency and degradation profile.
PV modules, inverters, storage and balance-of-system components procured against your electrical and mechanical specification, with the shipment coordinated alongside the order.
Photovoltaic generation has moved from a specialist technology to a mainstream one, and for most commercial and industrial buyers the difficulty is no longer whether solar works. It is assembling a compatible, correctly specified equipment package and getting it to site in the right order.
That is where Tristar sits. We source and supply the equipment against the specification an engineer or EPC has set, and coordinate the logistics that bring it in. We do not design or install plant, and the copy on this page says so rather than implying otherwise.
Equipment is bought against your electrical and mechanical specification, not against whatever is easiest to obtain.
Modules, inverters, storage and mounting procured through a single relationship rather than four separate ones.
Voltage windows, string sizing and connector types confirmed across the package so components arrive able to work together.
The same house arranges the freight, so lead times and delivery sequence are handled with the order rather than after it.
A solar package is built from four equipment groups plus the services that move them. These are the categories Tristar sources against.
Monocrystalline and polycrystalline panels, including half-cut, bifacial and large-format cell designs, specified on output, efficiency and degradation profile.
String, central and micro inverters, plus hybrid units where storage is part of the design, matched to the array's voltage and current characteristics.
Lithium-iron-phosphate and other lithium chemistries, from commercial cabinets to containerised systems, with the management electronics that go with them.
Roof and ground mounting systems, ballasted and penetrating designs, and single-axis tracker structures for larger arrays.
DC and AC cabling, combiner boxes, protection devices, isolators, connectors, earthing and cable management: the components that make a package installable.
Data loggers, metering and monitoring hardware that report generation and fault conditions from the array.
We take the electrical and mechanical specification from your engineer or EPC and confirm what it actually requires before sourcing against it.
Equipment is sourced against that specification, with alternatives proposed only where they meet the same requirement.
Voltage windows, string sizing, connector types and communication protocols are checked across the package.
Pricing, payment terms, warranty conditions and lead times are set out in writing against the equipment list.
Freight is arranged alongside the order (containerised or break-bulk depending on the package) with delivery sequenced to the site programme.
Datasheets, test certificates, packing lists and customs documentation prepared for the destination market.
Warehouses, factories and commercial roofs offsetting daytime consumption behind the meter.
Plants with a steady daytime load, where generation displaces grid or generator supply.
Larger arrays where module and inverter pricing, tracker choice and logistics dominate the economics.
Solar paired with storage where supply reliability is the driver as much as cost.
Pumping and off-grid supply where connection to the grid is impractical.
No. Tristar sources and supplies equipment and coordinates the logistics that bring it in. Manufacturing is done by the producers whose equipment we procure, and the datasheets and warranties that travel with a shipment are theirs.
No. We supply against a specification your engineer or EPC contractor has set. Where a specification is incomplete we will say what is missing, but the design responsibility and the installation remain with your technical team.
Yes, and that is usually the more useful way to buy. Modules, inverters, storage, mounting and balance of system can be procured together, with compatibility checked across the package before anything is ordered.
The electrical and mechanical specification, the system size, the site location and grid conditions, the delivery window and the destination port. With those the desk can put together a real equipment list rather than an indicative one.
Containerised for most packages, break-bulk where structures or containerised storage systems require it. Freight is arranged alongside the order so delivery is sequenced to the site programme rather than arriving in the wrong order.
System size, electrical specification, delivery window and destination port: enough to build a real equipment list against.